Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8703897
- Product Categories
- Friendly Links
- home > Supply > Sewage treatment equipment installation price the cost of consulting Gansu ocean water supply and drainage equipment
Sewage treatment equipment installation price the cost of consulting Gansu ocean water supply and drainage equipment
Information Name: | Sewage treatment equipment installation price the cost of consulting Gansu ocean water supply and drainage equipment |
Published: | 2012-02-07 |
Validity: | 90 |
Specifications: | Complete |
Quantity: | 10.00 |
Price Description: | |
Detailed Product Description: | Sewage treatment equipment installation price the cost of consulting Gansu ocean water supply and drainage equipment Equipment on the basis' installation. Instructions for use GSH series as a whole fiberglass septic tank construction process: Actinobacillus → chamfer pit → handle base cushion → confirm elevation → equipment in place → to take over the injection → layered backfill → puzzle septic tank at both ends of observation wells → formation processing. Actinobacillus Trench pit Septic tank installation position in the engineering design drawings and installation elevation put line excavation slots pit. Dealing with base cushion Reference to provide users with the "kava size and basic layout diagram and backfilling instructions." Equipment in place This equipment is in place before the foundation leveling, and elevation to determine (Note that a high degree of septic tanks, H1), clear out of the water direction, the device is stable home. Take over the water injection In accordance with the drawings of a series of pipeline equipment in place to ensure tight seal, the bottom around the backfill 600mm thick sand layer, and then the pool water injection, water injection rate for the first time not less than 1/3 of the volume of equipment, not more than 1/2. Layered backfill Should be 200mm layer of backfill, compaction and backfill, to use the manual tamping or flooding Note change waterside backfill, careful construction, the backfill shall not contain organic matter, frozen soil and turn stone and other hard objects larger than 50mm should be fine grained soil backfill, pool top is strictly prohibited mechanical compactor, not local violently impact equipment. Brick, connection wells By drawing puzzle inlet and outlet observation wells, two clean-up inspection wells, can be used to add height to the surface of glass, steel wellbore, national standards may be brick inspection wells. Formation processing ◎ Material plexiglass steel has strong corrosion resistance, grease effect (grease trap rate> 95%), easy to clean. ◎ This product is suitable for the main library on the canteen, cafeteria and pantry and washing with oily waste water drainage. ◎ must be regularly cleaned of debris and grease in the grease trap The ◎ discharge of oil to close the outlet valve and the inlet into (the best conditions for hot water), then open the valve of the discharge of oil, grease, namely the discharge. |
Admin>>>
You are the 29405 visitor
Copyright © GuangDong ICP No. 10089450, Ocean Drainage Equipment Co., Ltd., Gansu All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 29405 visitor
Copyright © GuangDong ICP No. 10089450, Ocean Drainage Equipment Co., Ltd., Gansu All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility